Ryburn Crest Footbridge

Frescrete had to undertake a number of site visits in conjunction with RPM Tremco Illbruck where a minimum of 6 Nos adhesion pull off tests were carried out using an Elcometer Tester. The surface interface bond figures ranged from 1.0mpa to 2.5mpa. Frescrete were appointed...
20
MAR
2019

Bridlington Town Hall – Refurbishment Project

Bridlington Town Hall located on Quay Road was built in 1931 and is a Grade II listed building.  The council appointed Geo.Houlton as the main contractor for the £3m project due to start in 2019 and is scheduled to last for approximately 1 year. The works will be carried out...
14
MAR
2019

Wimpey Phase 2 – Concrete and Structural Repairs to 12 high rise flats in Leeds

Frescrete Ltd were awarded their biggest contract 2 years ago by Henry Boot Construction (who were working for Leeds City Council) following a tender process for 12 number high rise residential no fines concrete H blocks at varying storey heights in Leeds.  The contract was NEC3...
14
MAR
2019

Sonoco – Soffit Repairs

Frescrete operatives – working from allow towers had to mechanically saw cut using dust extraction and break out all spalled/deleterious concrete so an assessment could be made of the condition of the rebar which then had to be cleaned to SA2 or replaced with new, like for like,...
14
MAR
2019

Beeversleigh Flats – Walkway Decking and Waterproofing to Balconies

    Frescrete had to conduct hammer testing of the balcony walkway and thereafter break out any defective asphalt patches.  An application of Sika Monotop 610 and Sika Rapid Repair mortar was applied to the walkway concrete floor. Sikafloor Balcony 15 a waterproofing...
14
MAR
2019

Ceramex Ltd, Slough – Factory Floor MMA resin coating

Frescrete were appointed to apply an MMA resin coating system in Slough for an old customer. All the areas of existing painted concrete slab required preparing using an abrasive shot blasting equipment (Blastrac Machine) to remove all existing coatings and cement...
14
MAR
2019

Rutland Court, Leeds – Repairs to Balconies

Following site visits by Frescrete with NPS’s Structural Engineer, it was found that the front elevation of Rutland Court was constructed from load bearing masonry over 3 storeys in height. The independent reinforced concrete balconies cantilevered out from the buildings...
14
MAR
2019

Rotherham Interchange – Floor Screed

Frescrete had to prepare the floor in order to accept the rubber floor covering being installed by Fresco Flooring.  The existing ceramic floor tiles were homogeneously bonded to the existing substrate therefore all the tiled areas had to be scrubbed clean using a degreasing...
14
MAR
2019

Great Sankey – Swimming Pool Inlet Grilles/Waterproofing

Following a visit by Frescrete in conjunction with Mapie to inspect the exposed grilles and pipe entries to the larger and learner pools we agreed with the client the following recommendations. After removal of the existing tile adhesive and mesh approx. 300mm surrounding the...
14
MAR
2019

Royal Hallamshire Hospital

As part of the Royal Hallamshire hospital improvements Henry Boot Construction had to remove numerous masonry walls within the sub ground floor area to provide a number of essential operating theatres. The floor finishes varied in levels and were found to have a thick layer of...
12